Construction

Construction Project Management (CPM) is the overall planning, coordination, and control of a project from beginning to completion. CPM is aimed at meeting a client's requirement in order to produce a functionally and financially viable project. The construction industry is composed of five sectors: residential, commercial, heavy civil, industrial, and environmental. A construction manager holds the same responsibilities and completes the same processes in each sector. All that separates a construction manager in one sector from one in another is the knowledge of the construction site.

Construction differs from manufacturing in that manufacturing typically involves mass production of similar items without a designated purchaser.

Construction is the process of constructing a building or infrastructure. Construction differs from manufacturing in that manufacturing typically involves mass production of similar items without a designated purchaser, while construction typically takes place on location for a known client.Construction as an industry comprises six to nine percent of the gross domestic product of developed countries. Construction starts with planning, design, and financing and continues until the project is built and ready for use.

Related Projects

Our Process

  • Design
  • Preparation
  • Construction
  • Revision
  • Completion
Broadly speaking, design is a process of creating the description of a new facility, usually represented by detailed plans and specifications; construction planning is a process of identifying activities and resources required to make the design a physical reality. Hence, construction is the implementation of a design envisioned by architects and engineers. In both design and construction, numerous operational tasks must be performed with a variety of precedence and other relationships among the different tasks.
ite preparation involves the demolition or wrecking of buildings and other structures, clearing of building sites and sale of materials from demolished structures. Site preparation also entails blasting, test drilling, landfill, levelling, earth-moving, excavating, land drainage and other land preparation.
The benefits include: Removing obstructions makes the rest of the job easier. Increasing ease of access to the site for all the necessary workers and laborers. Clearing out the site removes these obstructions that might slow down further progress.
The construction process from start to finish involves all types of construction that are not easy tasks. Maybe it requires a lot of effort and investment. Building a building requires a lot of time and effort, but the result is a lasting asset to us. The housing construction process is a systematic task performed by professionals.
The revision of drawings is about keeping drawing records up to date to accurately show the details of a plant’s existing construction or to define the scope of what is to be installed or modified for a project. When a revision entails or extra man or woman modifications on a drawing, every alternate can be diagnosed with the aid of using a chain range enclosed in parentheses previous the outline of the alternate.
Construction Completion means when all Work specified in the Contract, excluding Work required during the warranty period, has been completed by the Contractor in accordance with the Specifications and Plans and accepted by the Department. Completion of Construction further means that the construction shall be completed in good quality, and free and clear of all mechanic, material and similar liens.